TECHNICAL CUSTOMER FOR THE DESIGN AND RECONSTRUCTION OF TRAFIC INTERCHANGE BETWEEN MOSCOW RING ROAD AND DMITROV HIGHWAY

Reconstruction of Dmitrov highway

The reconstruction works include the following objects:

  1. The reconstruction of the interchange between Moscow Ring Road and Dmitrov  highway. Construction of viaduct with a total length of 660 m (pile substructure, pile caps, piers). Construction of a tunnel with a total length of 950 m (sheet piling and slurry walls of the pit, excavation, foundation works). Construction of viaduct over the railway tracks of the Savelovsky direction with a total length of 192 m (pile works). Reconstruction of utilities and relevant engineering structures.
  2. Two-level traffic interchange at the intersection of Dmitrov and Dolgoprudniy highways. Construction of viaduct with a total length of 900 m (pile substructure, pile caps, piers, girders and spans). Construction of frontage roads and the main route lanes of the Dmitrov highway. Reconstruction of utilities and relevant engineering structures.
  3. The section from the two-level interchange at the intersection of Dmitrov and Dolgoprudniy highways to the city borders. Construction of two viaducts with total length of 465 m and 420 m (pile works). Construction of frontage roads, temporary roads and widening. Construction of retaining wall No. 7 (pilework). Reconstruction of utilities and relevant engineering structures
  4. Construction of a tunnel at the intersection of the Dmitrov highway and the 3rd Nizhnelikhoborsky driveway