Reconstruction of Dmitrov highway
One of the main achievements of recent years in the North is the reconstruction of the Dmitrov highway.
The reconstruction works include the following objects:
- The reconstruction of the interchange between Moscow Ring Road and Dmitrov highway. Construction of viaduct with a total length of 660 m (pile substructure, pile caps, piers). Construction of a tunnel with a total length of 950 m (sheet piling and slurry walls of the pit, excavation, foundation works). Construction of viaduct over the railway tracks of the Savelovsky direction with a total length of 192 m (pile works). Reconstruction of utilities and relevant engineering structures.
- Two-level traffic interchange at the intersection of Dmitrov and Dolgoprudniy highways. Construction of viaduct with a total length of 900 m (pile substructure, pile caps, piers, girders and spans). Construction of frontage roads and the main route lanes of the Dmitrov highway. Reconstruction of utilities and relevant engineering structures.
- The section from the two-level interchange at the intersection of Dmitrov and Dolgoprudniy highways to the city borders. Construction of two viaducts with total length of 465 m and 420 m (pile works). Construction of frontage roads, temporary roads and widening. Construction of retaining wall No. 7 (pilework). Reconstruction of utilities and relevant engineering structures
- Construction of a tunnel at the intersection of the Dmitrov highway and the 3rd Nizhnelikhoborsky driveway