GORKA Group designed the viaduct at the intersection of 1st Sovetskaya Street with the railway tracks of Moscow Railway Belarusian direction nearby the Zhavoronki railway platform. It was also planned to reconstruct the Mozhaisk highway at the intersection with the 2nd Uspensky Highway and design of the new stadium instead of the old one was proposed.
The project is under active construction to be fully completed by the end of 2022.