GORKA Group has developed project design documentation for the construction of rail viaduct at the 1st km of Stupino-Gorodishche-Ozery highway and provided the construction supervision.
The length of the construction site is 5,308 km.
The highway has an intersection with the Paveletsky railway, near the Stupino station, and with highways of various technical categories at different levels.
- The length of the overpass is 454.65 m
- Number of lanes – 4 (2 in each direction)
- Traffic capacity – 50 thousand vehicles per day
The construction was under the project “Easy highway crossing” of the program “Our Moscow Region” implemented by Governor Andrey Vorobiev.