DEVELOPMENT OF DESIGN DOCUMENTATION UNDER PROJECT: CONSTRUCTION OF VIADUCT OVER THE RAILWAY AT 1st KM OF CHEKHOV-POPOVO HIGHWAY.

Construction in Chekhov district

Another viaduct designed by GORKA Group: over the railway on the 1st km of Chekhov – Popovo highway, Chekhov district, Moscow region.

The length of construction is 1,687 km, the number of traffic lanes-2. The length of the overpass itself is 399.65 m, and its area is 5,125 m2.

Our company provided engineering and construction supervision.