DESIGN AND ENGINEERING OF MULTI-LEVEL TRAFFIC INTERCHANGES AT JUNCTION OF MOSCOW RING ROAD AND VERKHNIE POLYA STREET AND AT JUNCTION OF THE MOSCOW RING ROAD AND KAPOTNYA STREET
DEVELOPMENT OF PROJECT DESIGN DOCUMENTATION FOR THE CONSTRUCTION OF A MULTI-SPECIALTY CLINIC “BALASHIKHA CDH”
ENGINEERING AND CONSTRUCTION SUPERVISION OF THE TRAFFIC INTERCHANGE AT THE INTERSECTION OF THE VOLOKOLAMSK AND ILYINSKY HIGHWAYS
ENGINEERING AND CONSTRUCTION SUPERVISION OF THE REUTOVSKY WAY VIADUCT CONNECTING NOSOVIKHINSKOYE AND GORKOVSKOYE HIGHWAYS
ENGINEERING OF THE TRAFFIC INTERCHANGE AT THE 20th KM OF THE MOSCOW RING ROAD, BRATEEVO AND ZYABLIKOVO DISTRICTS
ENGINEERING AND CONSTRUCTION SUPERVISION OF THE VIADUCT THROUGH THE RAILWAY AT 20th KM OF THE NOSOVIKHINSKY HIGHWAY